SuperKEKB vacuum system operation in the last 6 years operation

Suetsugu, Y; Shibata, K; Ishibashi, T; Shirai, M; Terui, S; Kanazawa, K; Hisamatsu, H; Yao, ML

Suetsugu, Y (通讯作者),KEK, 1-1 Oho, Tsukuba, Ibaraki 3050801, Japan.

PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2023; 26 (1):

Abstract

The operation of the SuperKEKB has been ongoing since 2016. The vacuum systems of the main ring (MR) which consists of a 7-GeV electron ring (HER) and......

Full Text Link