Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction

Ibrahim, MW; Hanna, AS; Russell, JS; Abotaleb, IS; El-adaway, IH

Ibrahim, MW (corresponding author), Calif State Univ Los Angeles, Construct & Engn Management, Dept Civil Engn, E&T A-215,5151 State Univ, Los Angeles, CA 90032 USA.

JOURNAL OF MANAGEMENT IN ENGINEERING, 2020; 36 (4):

Abstract

Out-of-sequence work (OOS) is an activity or series of activities that were not performed according to baseline planned logical productive sequencing.......

Full Text Link