Design verification of the gyrotron diamond output window for the upgrade of the ECRH system at W7-X

Aiello, G; Avramidis, KA; Gantenbein, G; Jelonnek, J; Jin, J; Laqua, HP; Meier, A; Scherer, T; Strauss, D; Thumm, M

Aiello, G (corresponding author), Karlsruhe Inst Technol KIT, IAM, D-76344 Eggenstein Leopoldshafen, Germany.

FUSION ENGINEERING AND DESIGN, 2021; 165 ():

Abstract

The 10 MW electron cyclotron resonance heating (ECRH) system at the stellarator Wendelstein 7-X (W7-X) currently relies on the successful operation of......

Full Text Link