Secondary arc duration on a 380-kV mixed transmission line during SPAR

Kizilcay, M; Bozek, M; Pfeifer, N

Kizilcay, M (通讯作者),Univ Siegen, Dept ETI, D-57068 Siegen, Germany.

ELECTRIC POWER SYSTEMS RESEARCH, 2023; 220 ():

Abstract

The transmission system expansion plan of Germany foresees several new EHV (Extra High Voltage) transmission lines to transmit bulk power generated by......

Full Text Link